As part of the 2018 Pedestrian and Cycling Program Action Plan, the city awarded a contract for the Study and Design of the Wolseley to Downtown Corridor in June of […]
The 2018 Osborne Village to Downtown Walk Bike Bridge & Connections Study is looking into the potential to build a new pedestrian and bicycle bridge over the Assiniboine River between […]